The Details

 

Well this was an interesting one! confronted with some steep gradients which needed digging out ready for a garage build and a seating area further up the garden, all the material , some 250tons was relocated at the top of the garden to level up the sloping gradient, all topsoil saved and spread back over and seeded down.

About The Project