The Details

Old Tarmac removed, the base was leveled and new type 1 stone added where needed, the surface then was compacted and topped off with 20mm shingle, the dog seem to approve!!

 

IMG_20160505_142913256 IMG_20160511_104303932 IMG_20160512_134615434 IMG_20160512_134630584 IMG_20160512_134636420

About The Project