![](https://msclandscapes.co.uk/wp-content/uploads/2016/06/IMG_20160519_161902989_HDR.jpg)
The Details
An old footbridge was stripped of rotten existing sleepers and replaced with new, 18mm exterior ply was then fitted with a galvinised wire attached to provide a non slip surface.
An old footbridge was stripped of rotten existing sleepers and replaced with new, 18mm exterior ply was then fitted with a galvinised wire attached to provide a non slip surface.