The Details A large shrub bed was cleared with the mini digger first, then had a membrane installed before spreading 20mm shingle over the area to make a very low maintenance bed. PREVIOUS POSTNEXT POST About The Project Date:1st June 2012 Category: Low Maintenance Areas, Mini Digger Work Likes: 0 like Share: