16 Jan 2017

An old wall was pulled over to provide a sub-base material for the parking area, new timber sleepers were erected as a support, this was topped off with a compacted layer of 40mm scalpings and dressed up with 20mm shingle. A new decorative panel was installed for privacy with a side access gate.

 

IMG_20170111_084719112 IMG_20170110_120922257_HDR IMG_20170113_152252351 IMG_20170113_152302695IMG_20170110_120959413_HDR

01 Aug 2016

Out with the ugly concrete and tired fence, then brought up to date with new block paving complemented with a grey 20mm Quantock stone, a new close board fence replaced the old panels. Lovely customers, thanks for the T’s and cake! Big help from a work colleague on this one.

 

IMG_20160711_084459790 IMG_20160711_084525159 IMG_20160711_084535175_HDR IMG_20160729_145305797 IMG_20160728_150140424 IMG_20160803_132803446 IMG_20160803_132833409 IMG_20160803_132816134 IMG_20160718_162200874 IMG_20160803_132749841

29 Mar 2016

An old weed covered waste piece of ground was transformed in to a useful parking/function area by clearing the site of weeds and topsoil constructing a bank with the material, a perimeter linear length of timber sleepers was erected to form a clean edge and to retain the soil bank, hardcore was spread and compacted over a permeable membrane and then topped off with road plannings to provide a clean firm surface.

 

IMG_20160329_083945838_HDR IMG_20160331_095818394_HDR IMG_20160401_091629258_HDR IMG_20160401_113932914_HDR IMG_20160401_142334713_HDR IMG_20160401_142358239