The Details
A front lawn removed and turned into extra parking, the front path was reshaped to allow vehicle movement onto the new space. 20mm Quantock stone was used over a permeable sub-base allowing the natural water drainage.
A front lawn removed and turned into extra parking, the front path was reshaped to allow vehicle movement onto the new space. 20mm Quantock stone was used over a permeable sub-base allowing the natural water drainage.